Meeting with Project Supervisor (23-01-2009)

We had a meeting with our project supervisor Dr.Chandana Gamage today from 2.00pm to 3.45pm.

Summary of items that were discussed at today’s meeting.

  • Draft Final Project Report
    • Need to define the technical/project specific terms and phrases before using them
    • Need to add some simple examples to explain the working model of the system in discussion
    • Analysis the existing eID systems, try to check with following countries:
      • Honk Hong
      • South Korea
      • Malaysia
      • Scandinavian Countries
      • Other European Union Countries
    • Overall architecture of the eID system (which was accidentally removed)
      • Overall view of the architecture
      • Services Specific/Stacked view
      • Transaction View
  • Lecture on Intellectual Property Rights (next week)
    • Try to attend the lecture
    • Try to discuss about the potential of a patent for our project

We are currently working on the Draft of the Final Project Report and the Main Research Paper which are due to be submitted by next Sunday (January 25th).

Filed under Meetings